May 31, 2008

Work today

Got my GS-4 and Santa Fe F-unit up and running again. They have no place on my terminal railroad but power is power, right? I mean I suppose you could switch with a Northern type if you wanted to. My water areas are now blue. It's a start. I've decided to model the NP mainline to Snoqaulmie so I threw up some of my old EZ-Track along the top of the layout. I plan on ballasting it fine brown when the times comes. I'd like to do another movie. Look for it soon.

May 30, 2008

5 Hours to do that?

Left Hand Short Radius Peco Switch: $19.99
Strip of balsa wood the rough dimensions of an HO railroad tie: 25¢
Foam paintbrush: 40¢
Spending five hours laying, soldering, and ballasting track, adding details to a dock and running in a new locomotive? Priceless

I discovered that last night my track had wandered left. I'm not sure how, but wander it did. I'm using Locktite adhesive to keep my track in place, as suggested here. Maybe that has something to do with it. So I vacuumed what I could and re-laid and re-ballasted the track.
I'm laying track on the fly because I've discovered my nice little plan I had sketched out is simply not going to work. But all the industries in Salmon Bay will have rail service. I laid and ballasted the track toward East Ballard. Due to the fact the fiddle yard is not going to be built in my time in Missoula, nor is East Ballard itself, I've added a bumper modeled after the ones used at Fort Missoula.
I grabbed the medium ballast as opposed to the fine so it looks chunkier then that seen on the real SBT, but it looks wonderfully like that seen at the fort. Just dumped in place and enough to get the job done. This is fine because the SBT uses 152lb rail.
I also added some detail to the dock. Mainly a railroad tie at the end of the dock so my trains don't just keep going. That new tank car rolls like nothing and after one near miss I decided it was time. I added some more dowels to make it look more "docky". Still have no idea what I'm going to put under it. It's amazing how the Dark Walnut stain I'm using looks like cresote though.
My next job is getting the cannery spur in place. The cannery is built at the other end of Salmon Bay and included the run around track. Space keeps getting tighter and tighter on the layout, but it will be done.
The Davenport arrived today, and after running for about an hour has started giving me fits. Not sure why. Look good though!
I'll get pics up tomorrow.

May 29, 2008

Green Light on the Southern



Originaly by Norman Blake, performed here by Punch Brothers 7

3-Spot Runby (Video)


Hauling a shorty tank and Galena for run-in purposes. She will make a wonderful addition to the SBT. The Davenport should be arriving tomorrow.

Pictures

Photobucket
This sign hangs above the layout. Fits me to a "T".

Photobucket
Here we have a shot of the whole layout as it stands currently. East Ballard would be to your left, 62nd Ave NE and the ferry slip to your right.

Photobucket
The Salmon Bay Pier. Not the prettiest pier but it does work. And I'm rather pleased how it turned out. That is partialy completed boxcab #12 near the pier. No locomotives are allowed on this structure. The Salmon Bay station will reside here.

Photobucket
I ballasted all the track I had today. Here is a long shot. Notice my strip wood crossing. Why buy it when you can build it? To a point that is.

Photobucket
My Peco switches I ballested. All joints will be soldered.

Photobucket
My railroad in exile. The Temporary & Carpet Southern. That's the 3-spot on the spur. Built a tank car today too.
And here is a forlorn shot of #10 after a painting, er, accident. Incident? Well a painting someting. I'll strip it and start over.
Photobucket

May 28, 2008

Dock

The Salmon Bay Terminal now has a terminal. Having never scratchbuilt something in my life I completed a dock today. It's not perfect but servicable and will hold the Salmon Bay depot and freight house. And the whole layout is brown now. I'll get some pictures up later tommorow.

Art Imitating Life?

While looking through the UW archives I came across a map of the Seattle, Lake Shore & Eastern.
Photobucket
The part I found interesting was this bit here:
Photobucket
That with a few modifications is the route of the BT&NCRy. Minus of course the run to the Canadian border and connection to Seattle. It's interesting to note they swung north of Lake Washington to achieve Snoqaulmie while Ronald Seitz chose to cross the lake by ferry. Even before the first rails were laid out of East Ballad the railway was in direct competition with the Northern Pacific That's no good for this upstart. The SL&E only lasted seven years before being taken over by the NP, a process repeated across the country as big railroad bought up small ones. (For SL&E history, click here) No wonder the Seitz Extension was unprofitable from the beginning. Finding this map puts the railway in perspective and makes modeling it that much more fun.